Project Overview
This commercial retaining wall project in Saratoga Springs spans 600 linear feet along the perimeter of a newly developed strip mall. Designed with both structural stability and clean visual appeal in mind, the wall features a smooth stucco finish and was installed using Eco Smart’s signature EPS foam core system. With a compact 2-person crew and full excavation handled in-house, the project was completed in just 2.5 weeks showcasing both the efficiency and scalability of foam-based construction in high-traffic commercial applications.




Materials & Features Used
- Retaining Walls: EPS foam block core
- Finish: Smooth stucco (custom-matched to strip mall exterior)
- Linear Footage: 600 linear feet
- Location: Saratoga Springs, Utah
- Project Type: Commercial (strip mall perimeter)
- Excavation: 100% completed by 123 Built
- Install Crew: 2 team members
- Timeline: 2.5 weeks
Builder Statement
At Eco Smart, we’re committed to bringing innovation and efficiency to every project whether it’s a residential backyard or a high-visibility commercial build. This Saratoga Springs project is a great example of how EPS foam walls can save time and labor while still delivering a clean, modern look. Our two-person team completed all excavation and installation within 2.5 weeks, providing the strip mall with long-lasting soil retention and a polished visual edge.
Technical Details
- Wall System: EPS foam insulated retaining wall using Simply Built Systems
- Finish: Stucco
- Length: 600 linear feet
- Installation Time: 2.5 weeks
- Crew Size: 2 installers
- Excavation: Fully completed by 123 Built
- Location: Saratoga Springs, Utah
- Use Case: Commercial retail property perimeter
- Builder: Hadco Construction